Is this another case of optimistic out turn cost prediction and/or changed requirements during the construction phase?
| less than a minute read
London Bridge Redevelopment
Painful lessons from the five-year redevelopment of London Bridge station must be heeded in the £4 billion rebuild of London Euston for HS2, MPs have said (Robert Lea writes).
The Commons transport committee’s warning comes after £900 million was added to the Thameslink project which has included the £1 billion London Bridge reconstruction.
After a prolonged and delayed legislative gestation period new developments in England will now have to provide a 10% net gain in...